Painter applying a fresh coat of paint inside a Singapore HDB flat

Property types · HDB

HDB Painting Services in Singapore

01

Complete flat repainting for 3 room, 4 room, 5 room and executive flats designed for your family without the mess.

Built for HDB living

Why does HDB painting need a different approach?

Singapore flats are busy. Kitchen walls are coated with grease film, bathroom walls are wet for hours at a time, and high-traffic corridors are scuffed from everyday use. A repaint that lasts begins with addressing those issues – degreasing and sealing as required, addressing mould-prone corners, and selecting washable, low-odour paints for an occupied home.

The City Painters will take care of the complete flat: ceiling, walls, door and door frame, gates and grilles. Furniture is moved and covered, floors are protected and at the end of each session the team cleans up so your home remains liveable throughout the job.

Wall preparation and skim coating before painting an HDB flat
Typical duration
1–3 days for most whole-flat repaints
Occupied homes
Yes — painted room by room
Standard scope
Ceilings · walls · doors · gates & grilles
Quotation
Free, after a quick site assessment

Scope of work

What our HDB painting packages include.

Every quotation follows a look at your flat's actual wall condition — no surprises added on painting day.

01

Whole-Flat Packages

One clear vision for the full flat, from a 3 room to an executive sized one – all according to your layout. Same colour refresh or full colour change (including preparation, protection, and clean up).

  • 3-room, 4-room, 5-room & executive
  • Same-colour refresh or new palette
  • Prep, protection & cleanup included
02

Ceilings & Walls

Ceilings remain bright, walls read as one surface, water marks, hairline cracks and patchy old paint are treated prior to any colour being applied.

  • Stain-blocking for water marks
  • Hairline crack filling
  • Washable low-odour emulsions
03

Doors, Frames, Gates & Grilles

Timber doors and frames are treated with hard wearing enamel; metal gates and window grilles are de-rusted, primed and coated for years of good appearance.

  • Enamel finishes for doors & frames
  • Rust treatment for gates & grilles
  • Brush or spray application
04

Kitchens & Bathrooms

The two most difficult rooms in any flat. Surfaces are pre-treated for removal of grease and dirt prior to painting, and a scrubbable system with moisture resistance is used to withstand the rigors of everyday use.

  • Grease-cut washing before painting
  • Anti-mould paint systems
  • Moisture-tolerant finishes
05

Mould & Stain Treatment

Black spots and damp patches that do not go away are investigated and treated (not painted over) to prevent reoccurrence with humidity.

  • Cause checked before covering
  • Treated, sealed, then repainted
  • Pairs with mould remediation
06

Colour & Finish Guidance

Unsure between white families or accent tones? We advise on colours and sheens room by room, based on light, furniture and how each space is used.

  • On-site colour advice
  • Sheen selection by room
  • Test patches on request
Painter working in a lived-in home with furniture protectedProtection before paint

Occupied homes

Living in your home while we paint it.

The majority of HDB repaints occur around the family, work-at-home environments and everyday activities. The job is sequenced so bedrooms are not all out of use at the same time and common rooms are never completely closed.

  • Furniture shifted, covered and returned
  • Floors, switches & fittings masked
  • Room-by-room schedule agreed up front
  • Daily tidy-up before the team leaves
Arrange a site assessment

Paint systems

The paint systems we use in HDB flats.

Paint is treated differently in various rooms. One system is selected for each surface based on the actual use of the room.

SurfaceWhat we applyWhy it matters
CeilingsStain-blocking sealer + ceiling white emulsionCovers old water marks and keeps ceilings bright without patchy flashing.
Living & bedroom wallsWashable, low-odour interior emulsionScuffs and marks wipe off; rooms are back in use the same day.
Kitchens & bathroomsAnti-mould, moisture-tolerant systemStands up to grease, steam and condensation without early peeling.
Doors & framesUndercoat + interior enamelA hard, cleanable film that takes daily knocks on timber.
Gates & grillesRust treatment + metal primer + enamelStops rust creeping back through the new finish.

Pricing, honestly

What affects HDB painting cost?

Every flat is quoted as one fixed price — these are the factors that move it up or down.

How it works

Our HDB painting process, step by step.

01

Assess

A walk-through of every room to note wall condition, mould, stains and access.

02

Protect & prep

Furniture covered, floors lined; walls washed, filled, sanded and sealed.

03

Paint

Ceilings first, then walls, then doors, gates and grilles — coat by coat.

04

Inspect & hand back

Joint inspection, touch-ups on the spot, and a clean, liveable home.

Why City Painters

Painters who treat your flat like a home, not a job site.

Clear scope before work starts, crews that turn up when promised, furniture back where it belongs each evening, and one fixed price for the whole flat- no additional extras on painting day. That's why our HDB owners refer us to their neighbours.

Get your flat assessed
Warm, freshly painted living space in a Singapore flat

FAQ

HDB painting questions, answered.

The questions homeowners ask us most before booking a whole-flat repaint.

How much does it cost to paint an HDB flat in Singapore?

It depends on the flat size, wall condition and whether ceilings, doors, gates and grilles are included. Whole-flat repaints are quoted as one fixed price after a short assessment, so there are no surprises later. WhatsApp +65 8972 2172 with your flat type for a fast quote.

How long does it take to paint a 3-room, 4-room or 5-room flat?

Most whole-flat repaints take one to three days. The exact schedule depends on flat size, wall condition and whether you are changing colours — dark-to-light changes need extra coats. We confirm the number of days in the quotation.

Do we need to move out while the flat is painted?

No. We paint room by room, shift and cover furniture as we go, and use low-odour paints, so the flat stays liveable throughout. Bedrooms are scheduled so they are ready to sleep in the same night.

Do you paint ceilings, doors, gates and window grilles too?

Yes. Ceilings, walls, doors, door frames, metal gates and window grilles can all be included in one package — most customers take the full scope so the whole flat matches.

Can you fix mouldy or water-stained walls before painting?

Yes. Mould is treated and stains are sealed with a stain-blocking primer before repainting. If the ceiling or wall has peeling concrete or exposed steel, we carry out spalling concrete repair first so the new paint has a sound base.

Can I choose any colour for my HDB walls?

Inside the flat, yes — any interior colour is fine. Surfaces facing the common corridor or the building exterior follow the estate's colour scheme, and we will advise you on those during the assessment.

Do you paint new BTO flats?

Yes. New BTO walls usually need only light preparation and two finish coats, or a sealer first where the developer's coating is chalky. Many owners book us right after key collection, before furniture arrives, for the fastest and cleanest result.

Free site assessment

Planning to repaint your flat?

Get a free quote

Certified contractor · trusted paint brands

BCA registered contractor
bizSAFE Star certified
HDB Registered Contractor
Nippon Paint
Dulux
Jotun
Gush Paint
Raffles Paint
Benjamin Moore
WhatsApp us